
KVNY to KOPF
Gulfstream G-550
Google Analytics is optional. Accepting lets us measure page use and successful quote requests without contact details. Advertising storage remains off. Read our privacy policy.
Plan a trip involving Bicycle Lake Army Air Field (KBYS) with airport location, runway references and nearby empty-leg listings. The direct carrier must confirm airport access and aircraft suitability for your itinerary.
KBYS - Bicycle Lake Army Air Field, Fort Irwin/Barstow, California, United States
ICAO Code: KBYS · IATA Code: BYS
Identifier references: OurAirports · FAA NASR (September 3, 2026).
View on Google Maps →Showing the first 10 of 208 current listings

Gulfstream G-550
Pilatus PC-12/47E (NG)

Challenger 300

Hawker 800XP

Citation X
Vision Jet
Citation Ultra

Citation CJ3

Phenom 100

Gulfstream G-IVSP
Airport Classification
Medium airport
Scheduled passenger service is not listed in the source; this does not determine charter access.
Longest Published Runway
9,631 ft
Reference length only; usable runway and aircraft performance must be confirmed for the mission.
Field Elevation
2,350 ft
Published reference elevation; verify current airport and performance information before departure.
FBO, Handling & Access
Confirm for this mission
Current suitability, handling, parking, fuel, and permissions require direct-carrier confirmation.
OurAirports identifies Bicycle Lake Army Air Field (KBYS) as a medium airport in Fort Irwin/Barstow, California, United States, serving the Fort Irwin/Barstow area. Its source identifiers are BYS, KBYS. The source does not mark scheduled passenger service, which does not determine private-charter access.
For preliminary comparison, the same source lists a longest published runway of 9,631 feet and a field elevation of 2,350 feet. Those values are reference fields, not an operating approval. Before a trip is proposed, the direct air carrier must confirm airport status and access, usable runway length and surface, aircraft performance, payload, weather, current notices, parking, fuel, customs when applicable, and handling for the requested date.
For a useful review, provide the passenger count, baggage, pets, accessibility needs, preferred schedule, and exact ground destination. Jet Partners acts as an air charter broker and does not operate aircraft; a licensed direct air carrier controls and operates the flight. Aircraft, airport suitability, availability, operator, payment, change, and cancellation terms are confirmed in writing for the specific trip.
Reference coordinates, classification, elevation, and published runway length shown on this page come from OurAirports open data for source ident KBYS. Reference fields can change and do not confirm airport status, charter access, or operator acceptance.
Planning references: the FAA Chart Supplement search and NOTAM Search. These are research starting points, not confirmation that KBYS accepts charter operations. Current access and mission suitability require direct-carrier confirmation.
| Airport | Distance from KBYS | Published runway |
|---|---|---|
| Bicycle Lake Army Air Field (KBYS)OurAirports record for KBYS | This airport | 9,631 ft |
| Goldstone (GTS) Airport (00CA)OurAirports record for 00CA | 15.3 mi | 6,000 ft |
| Barstow Daggett Airport (KDAG)OurAirports record for KDAG | 30.8 mi | 6,402 ft |
| Trona Airport (TRH)OurAirports record for KL72 | 53.7 mi | 5,910 ft |
Distances are between airport coordinates, not driving distances or flight routes. Runway figures are source references, not usable landing distances. View the KBYS source record or read the methodology and download airport reference data.
For a destination guide, trip brief or article, reference this stable page and the underlying source. Include the date you accessed it.
Jet Partners. Bicycle Lake Army Air Field (KBYS) airport planning reference. https://jetpartners.aero/airports/BYS#airport-reference. Reference data: OurAirports. Add your access date when citing.
Permanent link to this referenceRequest a trip-specific review involving Bicycle Lake Army Air Field. Airport access, aircraft, operator, availability, payment, change, and cancellation terms are confirmed in writing for the mission.